Thermal power plants 
Sendai Thermal Power Station Unit 4: Down
New Sendai Thermal Power Station Unit 1 ,2- Down

Haramachi Thermal Power Station Unit 1,2 - Down
Hachinohe solar power plant construction site
1500kW output
IMAGE



Hydro facilities
Equipment damage 11
Building falling rock,sediment influx 2

Electric substation equipment
Equipment damage 18
Transformer damage 86, Breaker damage  198, Disconnector injury 181

Transmission plant
Equipment damage 28, Inclined pylon fracture damage 42,
Broken insulator wire breakage 32,Underground cables damaged 15,Landslide 20

Distribution plant
Breakage or tilt support 26569
Broken or shot circuit wire 33121
Damage to transformers and switchgear 9010



13 May 
Thermal power plants 
Sendai Thermal Power Station Unit 4: Down
New Sendai Thermal Power Station Unit 1 ,2- Down
Haramachi Thermal Power Station Unit 1,2 - Down
Hydro facilities
Equipment damage 11
Building falling rock,sediment influx 2
Electric substation equipment
Equipment damage 15
Transformer damage 86, Breaker damage  198, Disconnector injury 196
Transmission plant
Equipment damage 27, Inclined pylon fracture damage 42,
Broken insulator wire breakage 32,Underground cables damaged 15,Landslide 20
Onagawa town

Working with rock drilling machine 16 May Ishinomaki city



Distribution plant
Breakage or tilt support 27308
Broken or shot circuit wire 34323
Damage to transformers and switchgear 9199